Obligation to insulate buildings during roof repairs or repairs
Verified 21 June 2024 - Directorate for Legal and Administrative Information (Prime Minister)
During important work of recharge or reduction roofing of existing buildings, thermal insulation work must be carried out. There are some exceptions. We're explaining the regulations.
Vessels concerned
Works ofthermal insulation must be carried out during major renovation or roof repair work on existing buildings. That applies buildings for use:
- Dwelling
- Office
- Commercial
- Teaching
This also applies to hotels.
Excluded buildings
This obligation does not apply the following categories of buildings:
- Buildings and parts of buildings where no energy is used to regulate indoor temperature
- Provisional construction planned for a period of use of 2 years or less
- Independent buildings with a floor area of less than 50 m²
- Buildings for agricultural, craft or industrial use, other than residential premises, which require only a small amount of energy for heating, domestic hot water production or cooling
- Buildings serving as places of worship
- Buildings which have received the 'Remarkable contemporary architecture' label
- Historical monuments classified or inscribed inventory, where this would have the effect of changing their character or appearance in an unacceptable manner.
The regulations depend on the type of work to which the building is subject:
Répondez aux questions successives et les réponses s’afficheront automatiquement
Facade renovation
General case
The developer has to carry out thermal insulation work on the walls concerned by reclamation work. This applies when all of the following conditions are met:
- The walls which are the subject of renovation work:
- Are walls of heated rooms overlooking the outside.
- Consist of a surface of more than 50%, excluding openings, of terracotta, concrete, cement or metal.
- The work involves at least 50% of a wall of a building, excluding openings:
- Either the rebuilding of the existing coating
- Replace an existing siding
- Let's put a new parliament in place
Exceptions
There may be exceptions to this obligation, in the following cases:
- If there is a risk of pathology of the frame related to any type of insulation. The developer must then justify the technical risk incurred by producing a reasoned note drawn up by a person skilled in the art under his responsibility.
- If the insulation work does not comply with easements or may not comply with the rules relating to land law, property rights or the appearance of facades and their layout. For example, if the insulation work did not comply with obligations regarding citizenship or easements.
- If the insulation work results in changes in the condition of the external parts or of the architectural and decorative elements of the construction which conflict with the requirements for remarkable heritage sites, the historic landmarks, the registered and classified sites, or with the rules and requirements defined in the local city planning plan (PLU)
- If there is a clear disproportion between the advantages of insulation and its disadvantages of a technical, economic or architectural nature. This applies in particular if the improvements made by this insulation have too great a negative impact in terms of the quality of use and operation of the building, of modification of the exterior appearance of the building with regard to its architectural quality, or of additional cost.
Roofing Rehabilitation
General case
The developer shall perform thermal insulation of the roof or high floor of the last occupied or heated level when a building undergoes roof repair work, if such work includes the replacement or covering of at least 50% of the entire blanket, excluding openings.
Exceptions
There may be exceptions to this obligation, in the following cases:
- If there is a risk of pathology of the frame related to any type of insulation. The developer must then justify the technical risk incurred by producing a reasoned note drawn up by a person skilled in the art under his responsibility (competent specialist staff).
- If the insulation work does not comply with easements or may not comply with laws or regulations relating to land rights, property rights or the appearance of facades and their layout. For example, if the insulation work did not comply with water flow or sunshine obligations.
- If the insulation work results in changes in the condition of the external parts or of the architectural and decorative elements of the construction which conflict with the requirements for remarkable heritage sites, the historic landmarks, the registered and classified sites, or with the rules and requirements defined in the local city planning plan (PLU)
- If there is a clear disproportion between the advantages of insulation and its disadvantages of a technical, economic or architectural nature. This applies in particular if the improvements made by this insulation have too great a negative impact in terms of the quality of use and operation of the building, of modification of the exterior appearance of the building with regard to its architectural quality, or of additional cost.
FYI
The work of thermal insulation of walls, floors and roofs must be carried out in accordance with the requirements indicated in a decree available on Légifrance:
Who can help me?
The public service accompanying companies
Do you have a project, a difficulty, a question of daily life?
Simple and free - you will be called back within 5 days by THE advisor who can help you.
Implementation of the obligation
General provisions (including exceptions)
Provisions applicable in the case of major roof repairs or repairs (including exceptions)
Requirements for insulation work
Ecological Transition Agency (Ademe)
Ministry of the Environment
Ministry of the Environment
Ministry of Culture and Communication